Project consisted of the remodel of an existing X-ray room/area to create an expanded Procedure/X-ray room with control room, patient holding room, equipment room, and work areas. The scope of work included the abatement of floor tiles and lead-lined drywall, demolition of wall partitions, ceilings, doors and frames, millwork, and concrete slabs. Underground utilities include plumbing and electrical for the relocation of sinks, toilets, and the X-ray equipment. The new X-ray room consisted of 4 lbs. per sq. ft. lead-lined drywall, Phillips equipment and lead-lined doors, frames, hardware, and windows.