Project consisted of a 6,500 sq. ft. OSHPD regulated tenant improvement on the second floor of the Steven Spielberg Building located on the Cedars-Sinai Medical Center Campus in Los Angeles. The project was constructed while labs, exam rooms and offices were in full operation below. The project scope included; infectious control, off hours work, demolition, installing plumbing over sensitive lab space, upgrading electrical system to code, nurse call code blue and emergency pull cords, decorative 3 Form partitions, structural steel upgrades, drywall, millwork, MEP, security card readers, fire sprinkler, fire alarm, flooring and painting. Additionally Pereraprepared the space for state licensing and providing all the required testing and reports for the licensing inspection process.