Project consisted of the demolition of the top slab of existing concrete, handrails, planter wall, and Jimmy Fallon sign at the tram bridge. Project included the installation of new drainage system along edges of bridge as well as trough drains at ends of bridge. Perera provided new waterproofing under new concrete slab and installed new decorative slab of concrete at bridge landings and throughout the whole bridge. Project also included the construction of new planter wall, new stucco, and new electrical infrastructure for speaker system and lighting. Also included fabrication and installation of new handrails and powder coating existing handrails.