UI8A9762.jpg
IMG_1149.jpg

This project included the complete removal of the roof from the Natatorium along with abatement, re-framing, re-plastering and painting of the interior underside of the new roof that was installed. Additionally covered in this cost was that to install new fire sprinkler branch lines, start up the Desert Air System, cut-in new eaves along the exterior of the structure and miscellaneous painting.